CO129-181 - Governor Hennessy - 1878 [1-8] — Page 41

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

40

levels under the impression that the permanent works would be commenced almost immediately

The roadwa

ay beer barrelled and poised to the

however has since

height of

the

red).

line and in

site of the wall behoun Cross section ho 30 and White's Landing steps. This length of the wall is recommended to be placed little further out for

A

purpose of oblaining

A

better allign.

the

a better.

joint

with the

рем

munt and...

many plans concreted, pending the finals settlement

of

the

style

of structure to be adopteds.

in

The offsets in black figures denoter the depth of water along the foot

of

the wall.

wall during dow Water Springs

S. W. Monsoon

༦༽

02 A.

Showing he d. is a repetitions larger scale and with mois details

of

the

portion linted ped in Draw_

ing he 1 and is intended

especially

to show by

jula us

of

the red line the proposed altered.

site

manent

at While's steps.

From Cross Section he 30 eastwards

to the end of the Reconstructions opposites Wardley Street, it is

-mended to build ther

the same line and

hous

of

it is recom

ZALLA

wall in

A

the forenda.

the old wall which are good

and solids

tails

dre

which point fuller de

given further on. Drawings hos. It to 24 are

Cross Sec.

on)

tions loker at points denoted both plan and longitudinal Sec. and show the position of the

existing

tow

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.